Original > Show us your Hot Tub.

newbie getting started

<< < (6/7) > >>

ridger:
On the pad.

ridger:
Water going in.

ridger:
Heating up for the first time.

ridger:

ridger:
We were going to try to bring it across the porch and up the steps, but the bobcat driver saved us by laying a track of gravel across the muddy area.  This allowed us to roll it down onto the concrete pad.

On my Spa delivery agreement electrical requirements, it called for 3 wires plus a ground wire, for a total of 4 wires, all #6 wire.

What it did NOT say was these four wires had to be in a three foot section of flexible conduit with a female plug adapter, if you want the Jacuzzi techs to get you wired up and running.  SO, I had to break the speed limit running into town for these two items.  It might be a good idea for future buyers to ask maintenance techs some extra questions on wiring requirements that aren't written down in your delivery agreement.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version