Original > Show us your Hot Tub.

newbie getting started

<< < (5/7) > >>

ridger:
Concrete was stained today.  Now if I can just keep falling leaves off it while it dries.

wmccall:
Thanks for all the pictures, can't wait to see the rest.

ridger:
Glad you guys are enjoying the photos.  Hot tub is suppose to be here in two days.  Of course electrician says he can't get here until tomorrow.  So sure hope he does, in order for the hot tub guys to wire me into power and get it filled up.  The landscaping is still ongoing.

ridger:
Dear Diary,
Nothing like last minute wiring before hot tub is scheduled to arrive tomorrow morning.  But Houston, we may have a problem.  Rain.  Causing a delay on gravel spreading that was going to offer drive-up drop-off access.  So now I'm waiting to hear if a Jacuzzi J-480 can be maneuvered along a ten foot wide porch in order to reach the connected concrete pad.  I'm sure some of you already know the answer to this question, and I should be finding it out pretty soon myself.


ridger:
It has arrived.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version