o-k so i am a newbe to spas & hot tubs we are looking into the Jacuzzi j-345. should i have the electrical done before delivery or wait till its delivered?
-
Usually our customers have their spas wired after delivery and placement.
Most electrical installations can be done within a couple of hours or so.
-
Assuming you don't have to replace the house's main electrical service, that's a good plan. I had an electrician come out for an inspection + quote to validate that I didn't need anything dramatic or with a long lead-time.
-
If your electrical involves burying conduit AND building a concrete/masonry pad, you might want to do the two operations together. Might save some $.