Original > Hot Tub Forum

Let’s Talk Dimension One (D1)

<< < (13/14) > >>

bachman:

--- Quote from: swilly1000 on January 23, 2019, 09:47:06 pm ---I can link and see the photos.

Anyone else?

--- End quote ---


Look back at your post in the show us your hot tub section, compare that link to the one you have now, you'll see what's different.

THEN   https://photos.app.goo.gl/8oQSnycqmwxqMM9a7

NOW   https://photos.google.com/photo/AF1QipPcirVWPnraoRabRSOjz6GLp3h6d1cRi5viIqFU


Don't ask me for help though, I have a h3ll UVA time posting pics.   :-\

aug0211:
Any chance anyone on here has knowledge (preferably photos!) of what the "inside" of a Sarena Bay looks like?

We are trying to look at measurements for the electric to see where the wiring would need to come up out of the concrete pad if it is to be tucked away/hidden.

I cannot remember - does D1 use full foam insulation, or is it somewhat "open" with room to work for the wiring once we get the panel off?

Is the wiring hookup actually on the side of the tub when looking at it from the front, or is the wiring hookup in the front of the tub?

Trying to get an idea of how much "wiggle room" we have in terms of getting the conduit measurements correct so that it can be in the concrete hidden "inside" the tub.

aug0211:
I was able to find a pretty helpful schematics diagram at the following URL (tried including a photo, too).
http://www.dpspas.com/service/resources-and-manuals/sarena-bay-specifications

A couple questions - is the space between the "pedestal" (dotted lines) and the electrical inlet "open" space, or is it filled? Can the wiring come up anywhere in that open space and be OK, or does it have to come up literally exactly where the electrical inlet is?

Schematic image:
https://imgur.com/a/nfFgcDj

Sam:
I wouldn't stub up underneath.  There is very little margin for error underneath.

aug0211:

--- Quote from: Sam on January 30, 2019, 12:48:24 pm ---I wouldn't stub up underneath.  There is very little margin for error underneath.

--- End quote ---

Thanks, Sam. Our dealer actually just replied saying it's impossible with the Sarena Bay, and that you *have* to come up form the side? Is that right?

Other update - spa delivery delayed, pushed all the way back to the week of March 25. That's OK - buys us more time for better weather for the concrete pad (and gives us more time to get the electric taken care of).

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version